Product is added into your Cart.

x

Personal 2 Years

Available Format: 

Last Updated Date: 19-Oct-2023

Effective Date: 23-APR-2024

$ 10000

Related Products

CAAM's AIM Portal and ETOD Data: Elevating Malaysian Aviation with Precision and Safety

WBGB Area 2 Obstacle

Area 2 consists of Area 2a, Area 2b and 2c. Area 2a is a rectangular area around a runway that comprises the runway strip plus any clearway that exists. Area 2 b is an area extending from the ends of Area 2a with a length of 10 km. Area 2c is an area extending outside Area 2a and Area 2b at a distance of not more than 10km from the boundary of Area 2a.

WBGB Orthophoto

Colour (RGB) stereo imagery that covers the entire obstacles surfaces, for each runway at each aerodrome. 11-bit or 16-bit imagery with X, Y and Z for each raster point.

WBGB Aerodrome Surface Routing Network

Nodes and edges of the Associated Aerodrome Surface Routing Network. This represents a subset of an aerodrome that is suitable for taxiing special-seized aircraft.